Lock 27 Power Distribution Upgrade

US Army Corp of Engineers Lock 27 Power Distribution Upgrade
Granite City, IL
Completed in 2020
Prime Contract with USACE

Wissehr Electrical Contractors was awarded a prime contract by the US Army Corp of Engineers to complete the power distribution upgrades at Lock 27 in Granite City, the busiest Lock along the Mississippi River system. Electrical work included upgrade of the 1,200 amp 480 volt electrical service and power distribution system complete with zone selective interlocking and digital metering.

More

I-255 Lighting

East. St Louis, IL
Completed 2020
Subcontractor to Keeley and Sons / Kilian Corp Joint Venture

IDOT closed a deteriorated section of Interstate 255 to make repairs to pavement. During the closure all of the roadway lighting in the construction zone was replaced as well. Wissehr installed 5 miles of underground conduit and cable, all new aluminum light poles, and replaced all of the old high pressure sodium light fixtures with new energy-efficient LED fixtures.

More

Loop Trolley Maintenance Shop

Loop Trolley Maintenance Shop Facility and Office
St. Louis, MO
Completed 2017
Subcontractor to KCI Construction

Wissehr installed all electrical systems in the construction of the Loop Trolley office and maintenance facility that stores and maintains the Trolley cars. Work consisted of installation of 2000 amp electrical service to the building, automated transfer switches, generator provisions, and the 600VDC traction power substation and rectifier to provide power to the trolley catenary wire system.

More

MO-05 Substation Feeder Replacement

Bi-State Development Agency / Metro – MO-05 Substation Feeder Replacement
St. Louis, MO
Completed 2019
Prime Contract with Bi-State Development Agency / Metro

Wissehr installed new underground duct banks and switches for 2KV traction power feeder cables that power Metro’s overhead catenary system. Work involved sawcutting, removal, and replacement of pavement, installation of concrete encased duct banks with fiberglass reinforced polymer conduit, site restoration, and pavement replacement.

More

Petroleum Refinery Reactor – Oversized Load Escort

Petroleum Refinery Reactor – Oversized Load Escort
Wood River, IL
Completed 2021
Subcontractor to Mammoet Transport

Wissehr worked as part of the team that escorted a petroleum reactor weighing millions of pounds from a river terminal along the Mississippi River to an oil refinery in Wood River, IL. Wissehr removed and relocated multiple traffic signal mast arm structures along the route to allow the 33 foot tall and 200 foot long reactor to travel down state highways and county roads to its final destination.

More

Union Station Tunnel

Bi-State Development Agency / Metro – Union Station Tunnel Rehabilitation
St. Louis, MO
Completed 2020
Subcontractor to Kiewit

Installation and upgrades to electrical and communications systems for the Union Station Tunnel rehabilitation project in St. Louis, MO. Work included furnishing and installing a 65,000 lb pre-manufactured building to house electrical and communication equipment, installing a 250kw generator with transfer switches, installation of electrical communication conduit and duct banks, installation of manholes, fiber optic cables in fiberglass trough, and upgrade to vital life safety and communication system components.

More

SIUE Chiller Plant Renovation

Southern Illinois University at Edwardsville Renovate Central Chiller Plant
Edwardsville, IL
Completed 2015
Prime Contract with Illinois Capital Development Board

Wissehr Electrical Contractors was awarded a prime contract with the Illinois CDB for upgrading the medium and low voltage power distribution system at the central chiller plant which provides chilled water for HVAC systems at all of the buildings on campus.

More

SIUE Data Center

Southern Illinois University at Edwardsville Data Center Renovation at Dunham Hall
Edwardsville, IL
Completed 2015
Prime Contract with Illinois Capital Development Board

Wissehr made improvements in order to modernize the aging campus data center infrastructure. The work was carefully scheduled, coordinated, and phased with University officials to minimize disruption to the campus network.

More

Loop Trolley Overhead Catenary System

St. Louis, MO
Completed 2017
Prime Contract with Loop Trolley Transportation Development District

Installation of a single wire fixed termination 600V DC overhead catenary system and underground traction power system for the 2.2 mile long electric street car system. The loop trolley is the first and only electric streetcar system in St. Louis.

More